Installing a ceiling fan is a 2—4 hour project that can save significant energy by reducing air conditioning use in summer and circulating warm air in winter (via the reverse switch). The most critical requirement is a ceiling electrical box rated for fan support — standard light fixture boxes are not strong enough. If replacing a light with a fan, you must upgrade the box.