Overview
Mudding (finishing) drywall is applying joint compound over tape and fasteners to create a smooth, seamless surface. It is done in three stages after taping: the block coat, the fill coat, and the skim coat. Each coat gets progressively wider and thinner. Good mud work means minimal sanding. Budget 3–4 days for all coats including drying time for a 12x12 room.
Tips
Tip 1: Lightweight joint compound is easiest for a DIYer—it sands with half the effort of all-purpose and shrinks less.
Tip 2: Add a splash of water to premixed mud for the skim coat. Thinner mud feathers out to nothing much more easily than thick mud.
Tip 3: Do not try to get perfect results in one thick coat. Three thin coats drying and shrinking independently produce a far better result than one thick coat.
Tip 4: A mud hawk (a flat plate you hold) holds more mud and is faster than a mud pan for large areas. It takes practice but is worth learning.
Tip 5: The work-light rake test will show you everything that needs attention before priming. Rely on a bright LED work light, not the ambient room light.